A model you can argue with, not a promise.
We have not measured time saved: no baseline study exists yet. So here is the arithmetic instead, with every assumption on the page. Move them until you believe them.
30 hours
of student time, for the whole cohort, in one term
- Requests a mapped task would cover
- 1,800
- Saved on each of those
- 60 s
- Per student, per week
- 1.8 min
students × requests a week × weeks × share covered × (time by hand − time with CampusWay)
This counts only requests a mapped task covers. It leaves out a wrong answer, a task that stops short, and the time to install and learn it. Those can make the real number lower.
What would make this a measurement.
A pilot is where these stop being guesses.
- A stopwatch baseline
- Students doing the same tasks by hand, timed, before they have CampusWay. Not done yet.
- Real request counts
- How many requests a cohort actually makes each week, and how many a mapped task covers. The first invited cohort has not started.
- Whether the task finished
- A request only saves time if the student got what they asked for. CampusWay records how each task ended, and a pilot would report the rate.
- The same arithmetic
- Then this model is filled with measured values instead of sliders, and published with its dates.